Skip to content
Discuss Your Project
  1. Home
  2. Blog
  3. Turnkey dental clinic fit-out: setup, licensing support and handover list

Turnkey dental clinic fit-out: setup, licensing support and handover list

Updated: 15 min read

Picco Architecture's turnkey dental clinic service puts a clinic's whole job, from needs analysis and licensing drawings to fit-out and handover, into one contract. It suits dentists and investors in Türkiye who are opening a private practice, polyclinic or dental health centre and want one point of contact. Picco's records list 62 turnkey references; 58 of them appear in the project list on our website.

What does Picco handle in a turnkey dental clinic fit-out?

In a turnkey dental clinic fit-out, Picco Architecture takes on design, licensing drawings, construction and handover under one contract. Our listed services come together in one team: architectural design, interior architecture, technical drawings, design budgeting, site supervision and turnkey delivery. The investor receives a clinic ready for use.

The work handled under one contract:

  • Needs and specialty analysis: facility type, unit count, rooms by dental specialty, staff and equipment list.
  • Building suitability and survey: registered use in the land registry, occupancy permit, floor level, lift and existing services.
  • Concept and layout plan: patient and staff flows; treatment rooms, waiting area, sterilisation, X-ray and plant room; 3D visuals.
  • Construction and licensing drawings: architectural, electrical and mechanical drawings, the licence file drawings and the X-ray room plan.
  • Design budgeting: comparing materials, fabrication methods and alternatives by cost, quality and service life; schedule of works.
  • Fit-out: strip-out, partitions, floors and ceilings; compressed air, suction, water, wastewater, power and air conditioning; built-in furniture.
  • Equipment coordination: matching connection points for units, X-ray, compressor and suction plant with the equipment supplier.
  • Testing and handover: services tests, a snagging list, as-built drawings and a handover certificate.

The contract states whether medical equipment is included. General questions are answered on our clinic design FAQ page.

How does turnkey differ from a design-only service?

In a design-only service the designer hands over drawings; choosing contractors, running the site and carrying cost risk stay with the investor. With design and site supervision, the designer inspects the works, but the contracts remain the investor's. In the turnkey model, design, construction and handover sit in one contract, with one party responsible for defects and delays.

TaskDesign onlyDesign and site supervisionTurnkey
Layout plan and construction drawingsDesignerDesignerContractor
Drawings for pre-approval and licenceDesignerDesignerContractor
Selecting and contracting trade firmsInvestorInvestorContractor
Checking site work against drawingsInvestorDesignerContractor
Materials and furniture procurementInvestorInvestorContractor
Medical equipment procurementInvestorInvestorAs per contract
Time and cost riskInvestorInvestorContractor (under a lump sum)
Point of contact for defects and delaysSeveral firmsSeveral firmsOne contractor
Typical split of tasks across three service models; the actual split is set by the contract on each project. Source: FIDIC, Which FIDIC Contract should I use? (1999 suite); Turkish Code of Obligations, Art. 480, 2011; table compiled by Picco Architecture.

International contract forms call this model "EPC/turnkey". Under FIDIC's EPC/Turnkey Contract (the Silver Book), the contractor is wholly responsible for design and construction. It also carries the added risk of a fixed final price and time. FIDIC recommends it mainly for process plants, power plants and infrastructure. It notes that the form may also suit fixed-price turnkey buildings, with design responsibility adjusted.

In our view, design only suits investors who can manage several trade firms. For a dentist who treats patients until opening, one contractor reduces the coordination load.

How is the scope written into a turnkey contract?

Annexes make a turnkey scope measurable: the brief, the approved layout plan, a schedule of works, a materials schedule and an equipment list. Under a lump sum in Türkiye, the contractor as a rule cannot ask for more if costs rise. The investor pays in full if they fall.

  • Price basis: lump sum or unit rates. If unforeseeable circumstances make lump-sum work excessively difficult, the contractor may ask a court to adapt the contract (Turkish Code of Obligations Art. 480).
  • Exclusions: who covers medical equipment, signage, IT infrastructure and official fees.
  • Changes: later changes only with written approval of price and time.
  • Payment stages: by default the price is due on delivery (Art. 479), so staged payments must be written in.
  • Programme and licensing: a handover date within the pre-approval's validity, and who follows the applications.

This is general information, not legal advice; have a lawyer review the contract before signing.

What drawings and documents go into the licence file?

For licensing support, Picco prepares the drawings needed for pre-approval, licence and X-ray licence applications in Türkiye. These are the licence layout plan, the X-ray room plan and, when needed, revised drawings. They follow the current document lists of the provincial health directorate and the Nuclear Regulatory Authority. The facility itself applies. The governorship issues the licence for a private practice or polyclinic, the Ministry of Health for a centre or hospital.

StepApplicant and issuing bodyTime limit in the regulationPrepared by Picco
Pre-approval (not for a private practice)Facility applies; provincial health directorate issues it for a polyclinic, the Ministry for a centre or hospitalPolyclinic 15 working days; centre or hospital 15 at the directorate and 30 at the MinistryLayout plan to the current document list
LicenceA private practice, or a facility that has completed its pre-approved investment, applies; governorship issues it for a practice or polyclinic, the Ministry for a centre or hospitalOn-site inspection within 15 working daysLayout plan behind the licence, checklist of physical requirements
X-ray licenceFacility applies via e-Devlet; Nuclear Regulatory Authority issues itNot set in this regulation1:100 room plan for fixed units, with the use of neighbouring spaces marked
Operating permitLicensed facility applies; provincial health directorate issues it15 working days; the licence becomes void if, within 6 months of it, no operating permit is obtained and patient admissions have not startedHandover date planned around this limit
Alterations in a licensed clinicFacility applies; directorate reviews for a practice or polyclinic, the Ministry for a centre or hospitalNot set in this regulationRevised drawings approved by the municipality, with the drawings behind the licence
Licensing steps for oral and dental health facilities in Türkiye: applicant, issuing body, time limits and the drawings Picco prepares, as of November 2026; limits apply when the file is complete. Source: Ministry of Health, Regulation on Private Health Institutions Providing Oral and Dental Health Services, 2022 (last amended 15.12.2024); Nuclear Regulatory Authority, Dental Radiology; last column compiled by Picco Architecture.

Time limits and authorities are given as they stand in the regulation in November 2026; confirm the current position with the provincial health directorate.

After the licence application, a commission inspects the clinic. Under the December 2024 amendment, a centre or hospital commission includes an architect or civil engineer. For a practice or polyclinic, one may be added when needed. The licence layout plan must therefore match what was built.

A private practice (muayenehane) has no pre-approval stage. According to the Ankara Chamber of Dentists' March 2024 notice, its licence application includes a 1:100 or 1:50 layout plan approved by an authorised architect. The annexes changed again in December 2024, so confirm the current list with the provincial health directorate.

Application support is technical work: before the inspection, Picco checks the physical requirements against the regulation. Examples: a treatment room of at least 12 m² with one unit, and a radiology unit in a polyclinic. Our article on requirements to open a dental clinic in Türkiye compares the rules by facility type.

How does site selection affect the licence?

Site selection is the licensing decision that is hardest to reverse. Under Article 24 of Türkiye's Condominium Law (Law No. 634), a hospital, dispensary, clinic or polyclinic cannot be set up in a unit registered as a residence, business or commercial premises. Contracts between owners that breach this are void. Private practices that are not dispensaries, clinics or polyclinics are exempt.

A polyclinic that is not on the entrance floor, or cannot serve disabled patients there, needs a wheelchair lift or a stair or platform lift. A centre needs a detached building or a separate section with its own entrance. Its area is at least 500 m², plus at least 25 m² for each unit above five (Art. 6/2). Before signing a lease, have a lawyer and architect review the title and management plan.

What are the steps of a turnkey dental clinic fit-out, and how long does it take?

A turnkey dental clinic fit-out typically moves through eight steps, each with a concrete output. Total time depends on floor area, unit count and the need for pre-approval. With a complete file, the administrative steps with time limits add up to 30 working days for a private practice and 45 for a polyclinic. Design and site time come on top.

  1. Needs and specialty analysisFacility type, unit count, rooms by specialty and equipment list. Output: the brief.
  2. Building suitabilityRegistered use, occupancy permit, floor level, lift and existing services; measured survey. Output: due diligence note and survey plan.
  3. Concept and layoutLayout options, patient and staff flows, 3D visuals. Output: approved layout plan.
  4. Construction and licensing drawingsArchitectural, electrical and mechanical drawings, licence file, X-ray room plan; pre-approval for a polyclinic, centre or hospital is obtained at this step. Output: drawing set and coordination plan.
  5. BudgetComparing materials and fabrication alternatives by cost, quality and service life. Output: schedule of works, materials schedule and programme.
  6. Fit-outStrip-out, services, partitions, floors, ceilings and built-in furniture; coordinating trade teams and suppliers. Output: site records and sample approvals.
  7. Testing and handoverUnit and X-ray installation, services tests, final checks. Output: snagging list, as-built drawings and handover certificate.
  8. Licensing application supportObtaining the current document list, preparing for the on-site inspection, timing the operating permit. Output: physical requirements checklist and application timeline.
Typical steps and outputs of a turnkey dental clinic fit-out, November 2026. Compiled from the application steps in the regulation and common project stages; pre-approval rule from the Regulation on Private Health Institutions Providing Oral and Dental Health Services.

The sum of these administrative time limits is not an official maximum: the regulation sets no limit for issuing the licence after the inspection. For a centre or hospital the sum is 75 working days, as pre-approval allows 15 days at the directorate and 30 at the Ministry. Pre-approval is valid for 1 year for a polyclinic and 2 years for a centre or hospital, with one extension of up to 1 year.

When are services and unit positions fixed?

Services are fixed at the construction drawing step, together with the unit positions. Each unit needs compressed air, clean water, suction, wastewater and power. ISO 7494-2 sets the requirements for the air, water, suction and wastewater connections. Turkish regulation allows no more than one unit per room, so each unit means a separate services outlet.

The central suction standard, ISO 10637, covers suction equipment and central amalgam separators but not facility or exhaust piping. Pipe sizes, falls and routes are resolved in the mechanical design. In Picco's approach the equipment brand is chosen before the construction drawings; outlets fixed earlier may mean breaking out the floor.

Which documents, test records and lists are handed over?

At handover you receive keys and a file supporting the clinic's licence and maintenance. It holds as-built drawings, the licence layout and X-ray room plans, test records for each unit, equipment and warranty documents and the handover certificate. In Türkiye, licensed physical areas cannot be changed without the directorate's permission, so drawings must show what was built.

Document or recordPrepared or issued byWhenBasis
As-built drawings (architectural, electrical, mechanical)PiccoHandover dayPicco recommendation (because of revised drawings under Art. 15/10 and the permission rule in Art. 27/2-ç)
Layout plan behind the licencePicco; for a private practice, approved by an authorised architect at 1:100 or 1:50Before the licence applicationAnkara Chamber of Dentists notice, March 2024 (confirm the current list)
X-ray room plan (fixed unit, 1:100, neighbouring spaces marked)PiccoBefore the X-ray licence applicationRegulation Art. 21/2; Nuclear Regulatory Authority
Air, water and suction values for each unit checked against the installation documentsPicco and the equipment supplierHandover dayISO 7494-2 (connection requirements); Picco recommendation
Check against the minimum equipment listPicco, with the investor's equipment listBefore the licence applicationRegulation Art. 7/6 and Annex 4
Product Tracking System records for medical devicesEquipment supplier and facilityBefore the devices are usedRegulation Art. 19/9
Installation, operation and maintenance documents for the central suction unitManufacturer, via the supplierHandover dayISO 10637
Warranties, manuals and supplier listPicco and suppliersHandover dayContract annex (Picco recommendation)
Handover certificate and snagging listSigned by Picco and the investorHandover dayTurkish Code of Obligations Art. 474 and 477
Handover file of a turnkey dental clinic in Türkiye: document, who prepares it, when and on what basis, as of November 2026; timing follows a typical workflow. Source: Ministry of Health regulation, 2022 (last amended 15.12.2024); Ankara Chamber of Dentists, 7.3.2024; Nuclear Regulatory Authority, Dental Radiology; list compiled by Picco Architecture.

The handover certificate applies the inspection duty in the Turkish Code of Obligations. The employer inspects the work as soon as possible after delivery and notifies defects within a reasonable time, or is deemed to have accepted it. Acceptance ends the contractor's liability, as a rule, for defects visible on a normal inspection.

A defect that emerges later and is notified without delay stays the contractor's liability, as do defects concealed on purpose. Defect claims are time-barred, as a rule, two years after delivery, five years for immovable structures and twenty years for gross fault (Art. 478). Ask a lawyer which period applies to a fit-out.

How many turnkey references does Picco Architecture have, and where?

Picco Architecture's records list 62 turnkey references (November 2026). The project list on our website shows 58 projects with a turnkey scope, all in Türkiye and in the healthcare category. Of these, 55 are dental clinics: 46 polyclinics, 5 private practices and 4 oral and dental health centres. The other 3 are a hair transplant centre, a beauty centre and a dental supply store.

  • 62turnkey references, Picco Architecture records
  • 58turnkey projects in the website list
  • 55dental clinics among the 58
  • 12provinces (58 projects on the website), all in Türkiye
  • 450 m²median recorded area
Key figures from Picco Architecture's turnkey references. Source: Picco Architecture records (62 references) and Picco Architecture project archive (other figures), November 2026

In the website list, 37 turnkey projects are in Antalya and 7 in Istanbul. Ankara, Aydın, Denizli and İzmir have 2 each, and Muğla, Afyonkarahisar, Burdur, Isparta, Çorum and Eskişehir 1 each. The projects are recorded between 2015 and 2026; the year with the most records is 2021 (13 projects).

The 58 turnkey-scope projects in the website list by province (number of projects). Source: Picco Architecture project archive, November 2026
Show the data as a table
ProvinceTurnkey projects
Antalya37
Istanbul7
Ankara2
Aydın2
Denizli2
İzmir2
Other 6 provinces (1 each)6

Of the 126 dental clinic projects in the archive, 55 are turnkey, 40 design and site supervision and 31 design only. About 59% of our dental projects in Antalya (34) are turnkey, against about 31% (21) outside Antalya. The 4 dental clinic projects outside Türkiye were design or design and site supervision.

Turnkey projects range from 86 to 2,000 m² of recorded area. The 54 dental clinics with a recorded unit count have 2 to 17 units, median 6. The 17-unit Dentafly Oral and Dental Health Centre in Antalya is recorded at 1,020 m²; the 2-unit Doctor Can polyclinic in Istanbul at 140 m². The 58 turnkey projects on the website are listed with our other healthcare projects.

Let’s discuss your dental clinic.

Leave a few details and our team will get in touch to discuss the scope, the budget and the next steps.

On-site surveys of existing premises are free of charge.

Prefer to talk now? WhatsApp Call Picco Architecture: +90 850 532 10 50

Type of facility
Do you have premises?
Contact Details
How did you hear about us? (Optional)

Please confirm that you have read the privacy notice to continue.

Frequently asked questions

Is medical equipment included in a turnkey dental clinic price?

The contract decides; the turnkey concept does not include medical equipment automatically. Even when it is excluded, the equipment list and installation data must feed into the construction drawings. Turkish regulation makes the minimum equipment in Annex 4 mandatory and requires every medical device in use to be registered in the Product Tracking System.

Can a licensed dental clinic be refurbished on a turnkey basis?

Yes, but the physical areas behind the licence cannot be changed without the provincial health directorate's permission. Major repairs and alterations require revised drawings approved by the municipality. If the clinic moves, pre-approval, licence and operating permit are obtained again. A refurbishment therefore starts with a survey checked against the drawings behind the licence.

How should turnkey bids be compared?

Bids are comparable only when based on the same brief and schedule of works. Then compare exclusions, lump sum versus unit rates, the change procedure and the handover documents. A total alone can make a narrow-scope bid look cheap.

How much does a turnkey dental clinic cost?

Cost depends on floor area, unit count, facility type and whether medical equipment is in scope, so a single figure would mislead. Our article on the cost of opening a dental practice sets out the budget items by unit count. Picco's turnkey dental clinics on the website have a median of 450 m² and 6 units.

Has Picco delivered turnkey clinics outside Antalya and outside Türkiye?

In the website list, 21 of the 58 turnkey projects are in 11 provinces outside Antalya. Our 5 healthcare projects abroad are in Bishkek, Najaf, London, Baku and Iran; their scope was design or design and site supervision. The list has no turnkey project outside Türkiye.

In a turnkey dental clinic, the scope annexes and handover list agreed at the start decide the result. To define the scope and licensing timeline for your site, unit target and facility type together, contact us.