How much does it cost to open a dental practice? Budget by chair count
There is no single answer to how much it costs to open a dental practice. The number of chairs and the floor area they need drive the budget. In 124 Picco Architecture dental projects with recorded chair counts, the median was 78 m² per chair, and 400 m² for 5-chair projects. For scale, an official reference does exist. Türkiye's Ministry of Environment, Urbanisation and Climate Change sets TRY 23,400 per m², excluding VAT, for a new dental centre building in 2026.
How much does it cost to open a dental practice, and which lines make up the budget?
The cost to open a dental practice falls into three groups of budget lines. The first grows with floor area: rent or purchase of the premises, interior fit-out and building services. The second grows with the number of chairs, meaning dental units: the unit itself and the equipment of each treatment room. The third is installed once per practice: radiology, sterilisation, compressed air and suction, and licensing.
| Budget line | What drives it? | Basis in the Turkish regulation |
|---|---|---|
| Premises (rent or purchase) | Floor area and location | An oral and dental health centre must occupy a separate building or a self-contained part from the entrance; total area at least 500 m² |
| Interior fit-out and building services | Floor area; chair count (water, drainage, compressed air, suction and power for each chair) | Treatment room at least 12 m²; no more than 1 chair per room |
| Dental unit and room equipment | Chair count | Minimum medical devices and equipment listed in Annex 4 are mandatory |
| Dental radiology | Type of practice | Mandatory in polyclinics, centres and hospitals; X-ray devices need a Nuclear Regulatory Authority licence |
| Sterilisation, compressed air and suction | Once per practice; capacity sized to chair count | Centres need a central sterilisation unit or an outsourced service; hospitals must have the unit |
| General anaesthesia, observation unit and generator | Type of practice | Mandatory in centres and hospitals; the generator covers at least 70% of installed power |
| Licensing and opening period | Type of practice and time | Preliminary permit before investment, except for dental offices; minimum staff for polyclinics, centres and hospitals listed in Annex 5 |
Splitting the lines into three groups shows which part of the budget moves when the chair count changes. Going from 4 to 6 chairs raises the chair-driven lines by about 50%. Lines installed once per practice, such as radiology or sterilisation, do not rise in the same proportion.
Add working capital to the set-up budget as well. It covers staff, consumables and the rent paid while the licence is pending. For polyclinics, centres and hospitals, the regulation sets the minimum health staff in Annex 5, so the staffing plan should be settled before the budget.
What is the cost difference between a dental office, a polyclinic and a centre?
In Türkiye, the cost gap between dental offices, polyclinics and oral and dental health centres comes from the regulation's space and unit rules. Dental offices and polyclinics have no minimum total area. An oral and dental health centre needs at least 500 m² of enclosed floor area, plus mandatory general anaesthesia and observation units. At the same chair count, a centre therefore needs more space and equipment than a polyclinic.
| Requirement | Dental office | Polyclinic | Oral and dental health centre | Dental hospital |
|---|---|---|---|---|
| Total enclosed area | No minimum | No minimum | At least 500 m²; +25 m² for each chair above 5 | At least 1,000 m²; +25 m² for each chair above 15 |
| Treatment rooms | At least 12 m², no more than 1 chair per room; no more than 2 chairs per dentist | At least 2 rooms to the dental office standard | At least as many as the minimum number of dentists | At least as many as the minimum number of dentists |
| Waiting room | At least 10 m²; +5 m² for each extra treatment room | At least 15 m² for 2 chairs; +5 m² for each extra chair | At least 50 m² for 5 chairs; +5 m² for each extra chair | At least 130 m² for 15 chairs; +5 m² for each extra chair |
| Dental radiology | No unit required | Unit mandatory | Unit mandatory | Expanded unit mandatory (including cone beam CT) |
| Sedation and general anaesthesia | Not permitted | Not permitted | General anaesthesia unit mandatory; theatre at least 30 m² | General anaesthesia unit mandatory; theatre at least 30 m² |
| Observation unit | Not required | Not required | 2–5 beds | 5–15 beds |
| Preliminary permit | Not required | Required | Required | Required |
The area rule for centres grows with the chair count. Each chair added above 5 requires at least 25 m² more enclosed area. The minimum for a 10-chair centre is therefore 500 + 5 × 25 = 625 m². A centre must also sit in a separate building or in a self-contained part with its own entrance, which narrows the premises available to rent.
The rules are set by the Regulation on Private Health Institutions Providing Oral and Dental Health Services. It was published on 6 October 2022 and last amended on 15 December 2024. Check the current text and annexes on the Ministry of Health's Oral and Dental Health Department page and with the provincial health directorate.
How much floor area does each dental chair need?
For dental offices and polyclinics, the Turkish regulation sets no total area per chair. Each treatment room must be at least 12 m² and hold one chair at most. Centres add at least 25 m² for each chair above 5, and hospitals for each chair above 15. In Picco Architecture's 124 dental projects with recorded chair counts, the median was 78 m² (about 840 sq ft) per chair; the middle half fell between 63 and 100 m².
Show the data as a table
| Number of chairs | Lower quartile (m²) | Upper quartile (m²) |
|---|---|---|
| 1–2 chairs (18 projects) | 45 | 70 |
| 3–4 chairs (31 projects) | 63 | 97 |
| 5–6 chairs (39 projects) | 67 | 105 |
| 7–9 chairs (21 projects) | 72 | 100 |
| 10 chairs or more (15 projects) | 85 | 130 |
Area per chair is the total floor area of the practice divided by the number of chairs. What pushes the total up are the spaces outside the treatment rooms: waiting and reception, radiology, sterilisation, staff changing and rest rooms, toilets, storage and plant space. The regulation makes some of these mandatory but gives no size for most of them.
An example shows the gap. In a 5-chair polyclinic, the rooms the regulation sizes add up to 90 m²: five 12 m² treatment rooms and a 30 m² waiting room. Across Picco's 22 five-chair projects, the median total area was 400 m². The rooms the regulation measures cover about 23% of the real floor area.
The data show a second pattern: area per chair does not shrink as the chair count rises. The median was about 60 m² in 1–2 chair projects and 96 m² in projects with 10 chairs or more. The type of practice alone does not explain it: in that band, the 10 polyclinics have a median of about 106 m² and the 5 centres and hospitals about 94 m². In our view, surgical, CT and patient reception spaces in larger practices may explain the gap; this is an interpretation, not a measurement.
When searching for premises, you can start by multiplying the target chair count by these ranges. The middle half of Picco's 5-chair projects fell between about 340 and 530 m².
How do you calculate a dental practice budget?
The cost to open a dental practice is best calculated line by line. Area-driven lines are floor area times cost per m²; chair-driven lines are chair count times cost per chair. Systems installed once per practice and working capital are then added. When the chair count or the premises change, the budget can be updated without starting again.
Set-up budget = Floor area × Cost per m² + Chair count × Cost per chair + Practice systems + Working capital
| Variable | Meaning | Example: 5-chair polyclinic |
|---|---|---|
| Floor area | Total floor area of the practice | 400 m² (median of Picco's 5-chair projects) |
| Cost per m² | Interior fit-out and building services per m² | From fit-out quotes |
| Cost per chair | Dental unit and treatment room equipment | From equipment quotes |
| Practice systems | Radiology, sterilisation, compressed air and suction | From equipment quotes |
| Working capital | Rent, staff, consumables and opening-period costs | From the business plan |
Scale check: at the Ministry's 2026 unit cost, a new 400 m² building comes to about 400 × 23,400 = TRY 9,360,000 (excluding VAT). In existing premises, the fit-out cost is set by quotes.
The official reference for a scale check is the approximate unit building costs published by Türkiye's Ministry of Environment, Urbanisation and Climate Change. The figure is the approximate cost of a new building per m² of total construction area; it is not a separate figure for interior fit-out. In the 2026 communiqué, oral and dental health centres are in class III, group C, at TRY 23,400 per m². The figure excludes VAT, includes 15% overheads and 10% contractor profit, and excludes the cost of land.
The communiqué's unit cost is not a quote. The Ministry sets these figures to calculate architecture and engineering fees, based on building materials of average quality. Fit-out in an existing building can differ from it depending on the design, materials and condition of the services. Polyclinics and dental offices are not listed separately; for unlisted buildings, the communiqué assigns the nearest group from quantity estimates. Using the centre figure in the example is our assumption.
Date your budget. The Turkish Statistical Institute (TÜİK) released its August 2026 figures on 9 October 2026. The building construction cost index was 28.94% higher than a year earlier. When you decide, update older quotes and the unit cost published in February 2026 (valid from 1 January) with a fresh quote or this index. If you are buying the premises, keep the purchase price as a separate investment line.
How does licensing affect the cost of a dental practice?
Licensing mostly affects the cost of a dental practice through time. In Türkiye, every dental practice except a dental office must obtain a preliminary permit before investing, and an on-site inspection precedes the operating licence. Each week of rent paid without seeing patients comes out of working capital. Writing the regulation's deadlines into the schedule from the start is therefore part of the budget.
- Preliminary permit. If the file is complete, the provincial health directorate issues a polyclinic's permit within 15 working days. For centres and hospitals, the file goes to the Ministry within 15 working days, and the Ministry has up to 30 working days.
- Permit validity. The preliminary permit is valid for 1 year for a polyclinic and 2 years for a centre or hospital; the regulation also allows a request for extra time.
- Operating licence. The application goes to the provincial health directorate with the documents listed in Annex 2. If the file is complete, the on-site inspection takes place within 15 working days of the application.
- X-ray licence. X-ray devices require a licence from the Nuclear Regulatory Authority (NDK).
- Medical waste. The practice takes the measures required by the Regulation on the Control of Medical Waste.
In our view, the step that protects the budget most is testing the layout against the regulation's room sizes and mandatory units before fit-out begins. Layout changes after work starts add both time and cost. We answer common layout questions in our clinic design FAQ.
How many dental projects has Picco Architecture designed?
As of November 2026, Picco Architecture's project archive holds 124 dental projects with a recorded chair count. Together they cover 719 dental chairs and 64,888 m² of floor area. The projects span 2015–2026; 120 are in 21 cities in Türkiye and 4 are in Kyrgyzstan, Iraq, Iran and the United Kingdom.
- 124dental projects with a recorded chair count
- 719dental chairs
- 78 m²median area per chair
- 54turnkey projects
- 5countries, 21 cities in Türkiye
Of the projects, 97 are polyclinics, 18 dental offices, 6 oral and dental health centres and 1 a dental hospital; 2 are dental clinics abroad. 54 were delivered turnkey, 39 as design and site supervision and 31 as design only. Antalya leads with 57 projects, followed by Istanbul with 16, Ankara with 9 and Izmir with 8. The archive also holds 2 dental clinics without a recorded chair count, a dental laboratory and a dental depot; they are not in these counts.
The range of scale is wide: the smallest record is an 86 m² dental office with 2 chairs, the largest a 3,000 m² polyclinic with 12 chairs. The Dentafly Oral and Dental Health Centre in Antalya is recorded at 17 chairs and 1,020 m² and was delivered turnkey. See our healthcare projects page for more.
Let’s discuss your dental clinic.
Leave a few details and our team will get in touch to discuss the scope, the budget and the next steps.
On-site surveys of existing premises are free of charge.
Prefer to talk now? WhatsApp Call Picco Architecture: +90 850 532 10 50
We have received your project enquiry.
Our team will review the information you shared and get in touch with you.
Frequently asked questions
How small can a single-chair dental office in Türkiye be?
The regulation sets no minimum total area for a dental office. It requires a treatment room of at least 12 m², a waiting room of at least 10 m² and a toilet with a washbasin; the two sized rooms add up to 22 m². Real projects are far larger: across Picco's 18 projects with 1–2 chairs, the median total area was 119 m².
Are a radiology unit and an X-ray licence mandatory?
A dental radiology unit is mandatory in polyclinics, centres and hospitals, but not in dental offices. The regulation defines it as a unit with a periapical or panoramic X-ray device. Any practice with an X-ray device must hold a licence from Türkiye's Nuclear Regulatory Authority. Check the Authority's current rules for room and shielding requirements.
How large should the waiting room of a dental practice be?
The waiting room grows with the type of practice and the chair count. A dental office needs at least 10 m², plus 5 m² for each extra treatment room. A polyclinic needs at least 15 m² for 2 chairs and a centre at least 50 m² for 5 chairs. A hospital needs at least 130 m² for 15 chairs. In these three types, each extra chair adds 5 m².
Can the Ministry's unit cost replace a fit-out quote?
No. The approximate unit building costs of Türkiye's Ministry of Environment, Urbanisation and Climate Change are published to calculate architecture and engineering fees. They assume building materials of average quality, exclude VAT and exclude land. They are useful for testing the scale of a budget, while the fit-out cost is fixed by quotes based on the design.
Must a practice licensed under older rules meet the new space rules?
Provisional article 1 of the regulation covers practices licensed before it entered into force on 6 October 2022. For physical, equipment and staffing standards, they remain subject to the regulation in force when they were licensed. The article does not separately address practices licensed between 2022 and 2024. Before relocating, expanding or changing type, ask the provincial health directorate which rules apply. This is not legal advice.
Setting the chair target, the type of practice and the floor area together is the first step in calculating the cost of a dental practice. To review your space programme and budget lines together, get in touch with us.