Hospitality design firms: how hotel projects run and how to choose one

13 min read

Hospitality design firms are practices whose architects and interior designers take a hotel from market study to opening, coordinating engineers, kitchen consultants and the operator. A project moves through feasibility, licence and operator decisions, the space programme, permit and construction drawings, a model room and pre-opening. When choosing a firm, verify similar completed hotels, the team and the proposal's scope. In Turkish municipalities over 50,000 people, a new hotel's architect also needs, as a rule, at least 5 years' experience.

What do hospitality design firms do on a hotel project?

Hospitality design firms design more than the shape of a building. They plan how guests, staff and the operator share one building without getting in each other's way. Behind the guest floors, lobby, restaurants, meeting rooms and spa sit the kitchens, laundry, stores and staff routes. The architect resolves both sides in one scheme and coordinates the other disciplines.

Three factors set a hotel project apart from a residential or office project:

  • Classification and licence. In Türkiye, the standards a hotel needs for a Ministry licence are set out in the Regulation on the Qualifications of Tourism Facilities. Classified facilities other than 1-, 2- and 3-star hotels, including 4- and 5-star hotels, are inspected with a points-based evaluation form.
  • Operator and brand. If the hotel will carry a chain brand, the brand's design and construction standards should be fixed at the start. A 2017 article by the law firm Akerman recommends attaching those standards to the architect's agreement.
  • Furniture and operating supplies. A hotel opens with furniture, fixtures and equipment (FF&E) and operating supplies and equipment (OS&E). Who specifies and who buys each item is part of the project.

The Ministry of Culture and Tourism's investment licence statistics give an idea of the scale of facilities at the investment stage. Because the licence is optional, they do not cover every hotel project. Provisional data for October 2026 lists 443 facilities with a tourism investment licence, totalling 53,123 rooms and 118,890 beds. Antalya accounts for 83 of these facilities and about 31% of the rooms.

  • 443facilities with a tourism investment licence
  • 53,123rooms and 118,890 beds
  • 120rooms: approximate average per licensed investment
  • 83facilities and 16,303 rooms in Antalya
Facilities with a tourism investment licence in Türkiye, provisional data for October 2026; the average is Picco Architecture's calculation. Source: Ministry of Culture and Tourism, licensed facilities by province, October 2026 (as republished by alomaliye.com)

By our calculation, licensed investments average about 120 rooms per facility, against about 68 for the 8,843 facilities holding an operation licence. Projects holding an investment licence are therefore larger, on average, than facilities holding an operation licence. Part of the gap may reflect facility types, since apart-hotels and guesthouses cannot receive an investment licence. In Antalya, the average for licensed investments rises to about 196 rooms.

What stages does a hotel project go through?

A hotel project starts with a market and feasibility study and ends when the tourism operation licence is issued. In between come the licence and operator decisions, the space programme, concept, permit and construction drawings, furniture specifications, the model room, construction and pre-opening. The sequence below shows decisions specific to hotels rather than the general stages of architectural work.

  1. Market and feasibilityTarget guests, star rating, room count and rate range are set; design starts within this frame.
  2. Licence type and operating modelThe facility type and class are chosen, along with independent operation, a management contract or a franchise; brand standards enter the project.
  3. Space programmeRoom types and numbers, food and beverage, meeting, spa and back-of-house areas are listed with their floor areas.
  4. Concept and outline designThe architect and interior designer set the massing, plans and interior language together; the operator and any brand give first approval.
  5. Permit drawings and investment licenceThe building permit is obtained with architectural, structural, electrical and mechanical drawings; an investment licence may be applied for.
  6. Construction drawings and specificationsDetails, room data sheets, kitchen and laundry designs, and the FF&E and OS&E schedules are prepared.
  7. Model roomOne room is built with all its finishes and furniture; size, cost and use are checked before mass production.
  8. Construction and commissioningWork is monitored against the drawings; building services are tested and the snagging list is closed.
  9. Pre-opening and licencesThe occupancy permit, the business licence and the tourism operation licence are obtained.
Sequence of decisions specific to a hotel project, compiled by Picco Architecture. Source: ISHC, The fundamentals of FF&E purchasing, 2019 and the Regulation on the Qualifications of Tourism Facilities

Two legal periods shape the timetable in Türkiye. A tourism investment licence also states the period within which the facility must open. The Ministry sets it at no more than two years and may extend it once, by no more than the original period. Under Tourism Incentive Law No. 2634, an accommodation business must obtain a tourism operation licence within six months of its business licence.

This article's legal information is not legal advice. Confirm the current rules with the Ministry of Culture and Tourism, your municipality or the relevant authority. We explain why the licence type comes first in our guide to the tourism operation licence.

The furniture side also takes time. An article by the International Society of Hospitality Consultants (ISHC) says even a small renovation keeps a project team together for six to nine months. It describes 18 to 24 months as more typical.

In our view, the most expensive mistakes are made at steps two and three. A scheme drawn before the operator and space programme are settled is largely redrawn when the star rating or brand changes.

Which consultants and specialists work on a hotel project?

On any hotel project, the architect works with at least structural, electrical and mechanical engineers. Under Türkiye's Zoning Regulation for Planned Areas, their drawings form the construction drawing set with the architectural project. Larger hotels add an interior designer, kitchen and laundry consultant, landscape, lighting and acoustic specialists, a cost consultant and operator representatives.

  • Architect. Prepares and signs the architectural project used for the permit, and on most projects coordinates the disciplines.
  • Interior designer. Prepares the interior design, details and furniture design for rooms, lobby and food and beverage areas.
  • Kitchen and laundry consultant. Foodservice Consultants Society International (FCSI) describes a foodservice consultant as an independent adviser who neither sells equipment nor works on commission. Kitchen design and laundry design appear in FCSI's list of specialisms.
  • Building services and energy engineers. Design heating, cooling, ventilation, hot water, fire and building automation systems.
  • Cost consultant. Handles quantities, estimates and budget control, tracking the cost of design decisions stage by stage.

The split of work between architect and interior designer should be written into the contracts. Türkiye's Zoning Regulation for Planned Areas requires a separate interior project for only three building types. These are airport terminals, hospitals with more than 300 beds and shopping centres larger than 30,000 m²; hotels are not on the list. Even so, interior decisions in a hotel directly affect room plans and services.

Becka Chester, a hospitality design consultant and ISHC member, recommends keeping architect and interior designer as distinct disciplines. She also advises managing the tension between them well. In our view, the interior designer should join at concept stage. We explain the difference in authority in our article on what an interior designer does.

Which drawings and documents are delivered?

The deliverables of a hotel project fall into three groups. The building permit needs architectural, structural, electrical and mechanical drawings; construction needs detailed drawings and specifications. Operation needs the furniture, fixtures and supplies schedules. Branded hotels add drawings and material samples submitted for brand approval.

  • Permit and construction drawings. Floor plans, sections, elevations and services drawings; the basis for building in line with the permit.
  • Room data sheets and specifications. Floor, wall, ceiling, door and wet-area finishes for each space, with performance criteria.
  • Kitchen, laundry and bar designs. Equipment layouts, service connections and service flows.
  • FF&E and OS&E schedules. According to the ISHC article, FF&E covers furniture, fixtures and equipment. OS&E is mainly guest-facing supplies that are not treated as capital spending. Whether televisions or banquet chairs fall under one or the other varies by owner and brand.
  • Responsibilities matrix. The same article calls for a matrix showing who specifies, buys, receives and installs each item. The author warns: "Do not start any project without one."
  • Classification checklist. In our view, check the outline design item by item against the target class's requirements, and against the evaluation form for 4 or 5 stars. Deliver the result in writing.

We cover the stages of a furniture order, test reports and the model room in our hotel furniture guide. A problem found in the model room is fixed in one room rather than hundreds.

What should you check when choosing a hotel architect?

When choosing among hospitality design firms, check legal eligibility first, then similar completed hotels, then the team and scope of services. Documents are safer than portfolio images. Request a list of permitted projects, reference contacts and a written proposal showing who works at each stage.

QuestionEvidence to requestWhy it matters
Are the architect and practice registered?Chamber of Architects membership and practice registration certificateA regulatory requirement for architects taking on projects in Türkiye
Is the legal experience threshold met?Evidence of at least 5 years' experience, at least 10,000 m² of permitted projects and at least 4 different buildingsRequired for new accommodation buildings in municipalities of more than 50,000 people
Has the firm completed hotels of similar scale?Completed hotel projects of the same scale and scope, ideally under the same operating modelBack-of-house and services decisions change with scale
What do references say?Contact details for contractors, project managers and purchasers who worked with the firm recentlyPeople speak more candidly by phone than in writing
Who will work on the project?The name of the lead principal and a written commitment to stay throughoutPractice workloads fluctuate
What does the proposal cover?A drawing list by stage, the extent of site supervision and who prepares the FF&E specificationProposals with different scopes do not price the same work
Is the kitchen consultant independent?A statement of no equipment sales or commissionEquipment is chosen in the operator's interest
Is the design checked against Türkiye's classification rules?An outline design compared with the target class's requirements, and with the evaluation form for 4 and 5 starsA shortfall found at licensing is expensive to fix after construction
Questions to ask and evidence to request when choosing a hotel architect, compiled by Picco Architecture. The ISHC criteria were written for choosing a hotel interior design firm. Source: Zoning Regulation for Planned Areas, art. 57; ISHC, 10 criteria for finding the right design firm, 2016; FCSI

The experience threshold was added to the Zoning Regulation for Planned Areas in May 2023 and took effect on 1 July 2023. It does not apply to buildings classified for state security, or to areas under Laws No. 2863 and 6306 and other special laws. In special-law areas, such as tourism centres under Law No. 2634, confirm with the relevant authority whether the exception applies. For architects with a thesis-based postgraduate degree in architecture, half of the criteria is enough. Our article on what an architect does covers the details.

In our view, compare scope before fees. If one proposal includes site supervision or an FF&E specification and another does not, the two fees are not for the same work.

Which hotel projects has Picco Architecture worked on?

As of November 2026, Picco Architecture's project archive holds 14 records in the hotel category: 10 in Georgia, 3 in Türkiye and 1 in Libya. Ten records are hotel projects and one is a resort. The other three are two sales offices in Tbilisi and the 2016 Hotel Design Show in Antalya.

  • Hotel and resort
  • Sales office and fair
Picco Architecture's 14 project records in the hotel category by city and type. Source: Picco Architecture project archive, November 2026
Show the data as a table
CityHotel and resortSales office and fair
Batumi50
Tbilisi32
Antalya21
Benghazi10

The Batumi records are Orbi City, Orbi Sea Tower, Orbi Beach Tower, Avenue by Orbi and Continental. Tbilisi has Radisson Blu, Radisson Collection and Central Park Towers. Antalya has Baia Hotel in Kundu and Concept Boutique Hotel in Manavgat, and Benghazi has Via Largo Resort Villa. Of the Georgian records, 3 date from 2023, 5 from 2024 and 2 from 2026.

All 8 records in the hotel category with a recorded scope are design commissions. The whole archive holds 156 project records in 8 countries and 31 cities, 131 of them healthcare buildings. The full list is on the page for our hotel projects in Batumi, Tbilisi and Antalya.

In our approach, each hotel project abroad is read against that country's building and tourism rules. Türkiye's classification criteria do not apply directly in Georgia or Libya, while brand standards apply on top of national rules.

Let’s discuss your hotel project.

Leave a few details and our team will get in touch to discuss the scope, the budget and the next steps.

Prefer to talk now? WhatsApp Call Picco Architecture: +90 850 532 10 50

Contact Details
How did you hear about us? (Optional)

Please confirm that you have read the privacy notice to continue.

Frequently asked questions

Who approves the architect's drawings on a branded hotel?

A branded hotel needs two separate approvals: the building permit from the local authority and brand approval from the brand's technical services. A 2017 article by the law firm Akerman recommends brand approval of plans, specifications and material changes. It also advises including the brand representative in the snagging and equipment start-up processes. In our view, these conditions belong in the architect's agreement from the start.

How many firms should you invite to propose for hotel design?

The ISHC article on choosing a hotel interior design firm recommends inviting two to four finalist firms to a competition. Most firms charge a small fee for this, which should be added to the budget. In our view, the same method can be used when choosing an architect. Giving every firm the same space programme and budget frame makes the proposals comparable.

Is a tourism investment licence mandatory for a hotel project in Türkiye?

As a rule, no; the investment licence is not a construction permit, and construction requires a building permit from the relevant authority. A tourism investment licence is needed for the incentives and rights in the Tourism Incentive Law. It states the investment's type, class and opening period. Some types, such as apart-hotels and guesthouses, cannot receive one and apply directly for an operation licence.

Can a design firm based abroad run a hotel project in Türkiye?

Concept and interior design can be carried out with a firm abroad, but the permit drawings must follow Turkish rules. Under the Zoning Regulation for Planned Areas, the architect taking on the project must belong to the Chamber of Architects and register the practice. In our view, the contracts should set the split of work and who signs which drawing.

How does the process change when an existing hotel is renovated?

In a renovation, the market and space programme stages are usually shorter; whether a permit is needed depends on the scope. A model room, an FF&E specification and a responsibilities matrix are still needed. The ISHC article says even a small renovation keeps the team together for at least six to nine months. If plans, wet areas or the structure change, confirm the permit with your municipality.

When comparing hospitality design firms, verify legal eligibility first, then completed work at a similar scale and the team that will do the work. To discuss your project's stage and the specialists it needs, get in touch with us.